Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.6809776
| No.6809776
- Product Categories
- Friendly Links
| Information Name: | Construction Technology of Chongqing epoxy flooring supplies |
| Published: | 2010-11-22 |
| Validity: | 30 |
| Specifications: | |
| Quantity: | 0.00 |
| Price Description: | Negotiable |
| Detailed Product Description: | Prime deal: the floor of the old professional mechanical polishing treatment, sand from the elimination of some polishing, cleaning dust, and then mechanically grinding the cement with ground surface, so that the ground level, no loss, no powder and so on. After sanding the construction, according to conditions on the ground to test for moisture content, wet test meter can be floor or in pursuance of professional experience, will complete a 2m * 2m floor tile in the film, film the bottom of the home drying of paper, around seal. After 72 hours, remove the drying of paper, if the construction can be ignited; not ignite or will not be interrupted construction. The high moisture content can be high-pressure common ground roasted ground or water guns spraying epoxy primer treatment of the ground. The first available thin thinner oil cleaning, oil the ground is thick with self-leveling cement rendering program to deal with. Construction of epoxy primer penetration: penetration of B epoxy resin, two copies of the primer mixture, with a professional hand-held mixer, stir, roll, or Scraping clean sweeping the ground, wait until after the full penetration, such as that local white, coated with or without light leakage, as the case can be partially re-roll one time to ensure that the seal primer; Epoxy coated construction: epoxy floor paint in accordance with the ratio requirements, first joined the main agent in the coating hardener mixture, stir evenly, add the appropriate amount of quartz sand, stir, pour on the ground, to do a comprehensive layer of Pifu trowel, filling local damage, and to give smooth surface. Adding quartz sand in the mortar shall be coated with an overall construction is completed, the construction process, with a trowel tipped and picked to remove impurities big bubble particles, 48 hours after drying to be hardening the ground fully sanded, and then ground to a vacuum cleaner dust , then a quartz powder in the construction of mortar coating. Epoxy painted finish construction: epoxy floor paint in accordance with the ratio requirements, first stir the main agent, hardening agent and then with the primary agent to the central into the barrel to prevent material mix is uneven. Stir evenly, every 15 minutes, allowed to fully respond, aging, and then roll the whole floor dedicated coating construction. Construction sand found immediately remove impurities, mixing paint bucket hardening if the state, must be replaced at any time to stop using and mixing barrel. Note that the construction process of the treatment roller prints. Paint protection (optional on the varnish): finish construction of the varnish after the roll, wait for 48 hours, you can wear soft soled shoes to enter, within one week can not be water, oil, acid, alkali and other chemicals Tu sticky. |
Admin>>>
You are the 28539 visitor
Copyright © GuangDong ICP No. 10089450, Clean Floor Engineering Co., Ltd., Sichuan All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 28539 visitor
Copyright © GuangDong ICP No. 10089450, Clean Floor Engineering Co., Ltd., Sichuan All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

