Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.6809776
- Product Categories
- Friendly Links
Information Name: | Supply anti-static floor paint Chongqing formula |
Published: | 2010-11-22 |
Validity: | 30 |
Specifications: | |
Quantity: | 0.00 |
Price Description: | Negotiable |
Detailed Product Description: | Film thickness: 1.0 mm 2.0mm 3.0mm Application: electronics, telecommunications, optoelectronics, computer rooms, electronic components, LED, SMT, biological engineering, semiconductor clean rooms, clean shop, or need to place anti-static Floor characteristics: the high performance epoxy floor, can quickly remove and prevent static electricity or electromagnetic waves generated, to avoid static sparks and electromagnetic interference and damage, anti-static long-lasting, surface resistance rate of 105-109Ω, up to a mirror effect . Construction Technology: 1. Waterproofing treatment: the first floor or basement waterproofing should be done; 2. Primary treatment: factors to the situation in accordance with good oil, wax, repair, polishing, dusting, etc.; 3. Epoxy Primer: Anti-static epoxy primer with a roller to enhance the adhesion between the surface and epoxy; 4. Laying of copper: The network roll-out distance of two meters each, then place aside to do ground handling; 5. Epoxy anti-static in the coating: anti-static epoxy resin will be adding an appropriate amount of quartz sand, using trowel evenly coated with a trowel or the number of road; 6. Epoxy anti-static coating batch: A batch of anti-static epoxy coated scratch a few channel to the requirements to achieve smooth and no holes, no batch of knives and sanding India India prevail; 7. Epoxy anti-static self-leveling top coating: surface coating with anti-static self-leveling epoxy coating with a trowel trowel surface, after the completion of the ground in order to achieve the overall clean and bright, color uniformity; 8. Construction Maintenance: 24 hours after completion of construction before the Master, 72 hours before the weight (subject to 25 ℃, low open Director to be appropriate.) |
Admin>>>
You are the 28539 visitor
Copyright © GuangDong ICP No. 10089450, Clean Floor Engineering Co., Ltd., Sichuan All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 28539 visitor
Copyright © GuangDong ICP No. 10089450, Clean Floor Engineering Co., Ltd., Sichuan All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility